The complete renovation of the Lobby will start on MONDAY, FEBRUARY 25th, AT APPROXIMATELY 9:00 AM Contractors will be removing the existing Floor Tile and preparing the concrete floor for the new tile installation. PLEASE BE PREPARED FOR EXCESSIVE NOISE AND DUST Please try to limit your travels through the Lobby. If you are able, use the south stairwell to the Mezzanine level and catch the elevator from there. THANK YOU FOR YOUR COOPERATION