High Point North
HPN NEWS
HPN News and Information
Keep your eye on this news page for upcoming meetings and current happenings around the HPN bulding.
Happy Holidays from HPN
18 December 2013
To all the Owners of High Point North
Thank you for all of your support this past season and for contributing to the High Point North Holiday Fund. We all wish you and your family a safe Holiday S...
RESCHEDULED: Fire Alarm Testing on December 20th
13 December 2013
To: All Owners and Guests From: Tom Downey
Fire Alarm Testing rescheduled for December 20th
As required by the Town of Ocean City, I have scheduled the annual test of the building's Fire Alarm an...
CANCELED: Fire Alarm Testing on December 18th
11 December 2013
To: All Owners and Guests From: Tom Downey
Fire alarm testign on December 18th has been updated to December 20th, see news.
Thank you and have a great day.
Sincerely, Tom Downey HPN/MGR
The work is complete, THANKS HPN Residents!
12 November 2013
The water is back on, the work is complete. Thanks to all the owners and guest for their cooperation and a special thanks to those mezzanine unit owners who allowed our "live in residents" to use t...
ATTENTION: ALL WATER WILL BE SHUT OFF TO THE ENTIRE BUILDING TODAY
29 October 2013
WHEN: Tuesday, October 29th, Around 12PM
This repair is not as extensive as the one we did over the past few days. This is a small leak that occurred due to the movement of the pipes. The outage s...
UPDATE: THE WATER IS BACK ON TO THE ENTIRE BUILDING!
28 October 2013
The repairs have been completed.
Discoloration may be visible in the water for a short time.
Please run your water in the tub, cold only, for approximately 10 minutes to remove any discoloration ...
UPDATE: THE WATER IS STILL SHUT OFF TO THE ENTIRE BUILDING
24 October 2013
The repairs today did not go well. Another section of the piping blew apart when booster pressure was added. Again the parts have to be special ordered overnight. When the parts arrive, Atlantic Pl...
UPDATE: THE WATER IS SHUT OFF TO THE ENTIRE BUILDING
23 October 2013
Except the Mezzanine level.
One of the pipes used in the repair had a hairline crack in it. The size of the pipe is special order and will not be on site until tomorrow afternoon. At that time Atl...
NOTICE: Water will be shut off October 22nd
04 October 2013
ALL WATER WILL BE SHUT OFF TO THE ENTIRE BUILDING EXCEPT THE MEZZANINE LEVEL
WHEN: Tuesday, October 22nd at 9:00 AM
The water main supplying the upper floors of the building has developed a leak ...
OWNER'S MEETING; ELECTIONS/Proxies; NEW BANK
13 August 2013
OWNER'S MEETING IN LESS THAN 2 WEEKS!!!
As noted in a memo to all owners on July 1st, the ANNUAL MEETING of HPN Owners will be held on Saturday, September 7th, beginning at 9:00 AM. As we have for...
SUNDAY NIGHT UPDATE - THE 2013 "SUMMER SEASON" HAS ARRIVED!!!!
20 May 2013
2013 Summer Season update; Elevator Tower repairs, Pool and Deck status, Lobby and Energy Upgrade Click "READ MORE" Summer Season update
WATER SHUTDOWN; OWNER'S MEETING DATE CHANGE
02 May 2013
COUNTDOWN TO SUMMER; PARKING REGISTRATION FEE INCREASING TO $30
WATER SHUTDOWN - TUESDAY, MAY 8th All water will be shut off within the building at 9AM on Tuesday, May 8th. The water main coming ...
WATER IS BACK ON!
27 March 2013
After a few starts and stops the water is back on, hopefully for good. Contractor Demco is still fine tuning the new frequency drives but water pressure is up and good all the way to the 13th floor...
ALL WATER TO BE SHUT OFF TUESDAY, MARCH 26TH
06 March 2013
Water throughout the building will be totally shut off beginning 6AM, Tuesday, March 26th
The HPN water booster sytem is failing and in need of replacement. Atlantic Plumbing will be removing the ...
WATER IS BACK ON - WILL BE RUSTY FOR A WHILE
25 February 2013
UPDATE - Thursday NIGHT, February 28th, WATER HAS NOW BEEN TURNED ON AGAIN - HOWEVER THERE IS A LOT OF RUST
Tom will be draining all lines after the water shut off earlier today to eliminate as mu...
NOTICE *** LOBBY RENOVATION HAS STARTED!!
25 September 2013
The complete renovation of the Lobby will start on MONDAY, FEBRUARY 25th, AT APPROXIMATELY 9:00 AM Contractors will be removing the existing Floor Tile and preparing the concrete floor for the new...
BOARD VOTES TO PROCEED WITH PROJECTS; GET YOUR HPN LOGO APPAREL ORDER IN
11 February 2013
HPN Apparel Order being placed soon We've extended to ordering period for new, any-sized HPN Logo apparel for a few more weeks. Please send your order in to Tom by early March!! Board Meeting Deci...
HAPPY NEW YEAR, ELEVATOR TOWER DAMAGE UPDATE
12 December 2012
HAPPY NEW YEAR
The HPN Staff and Board of Directors would like to wish all of our owners and their families a safe and prosperous New Year! We look forward to the opportunity to serve you during t...
HPN Survives Sandy - But with some damage
30 October 2012
We're happy to advise that the building survived the storm with what appears at this point to be minimal damage:
Some A-Stack units suffered damage when glass-enclosed balconies blew out. Owne...